Automotive garage and car dealership backflow in Upstate SC

The state cross-connection section does not name an automotive garage or a car dealership. Greer CPW lists both as common low hazards. Seneca’s manual puts auto repair garages and oil changing garages on a reduced-pressure bullet. The letter on the account is the device.

Sources checked November 16, 2026.

If this page and the letter on the account disagree, follow the letter. What is backflow testing is the state test. Double check versus reduced pressure is the hazard split in the regulation and in the Greenville Water, Spartanburg Water, and Anderson manuals. A car wash is a different line on the manuals that name one. Those lines are on Car wash backflow. A restaurant is a different line on the manuals that name one. Those lines are on Restaurant backflow. A dental office is a different line on the manuals that name one. Those lines are on Dental office backflow. A garage or a dealership on another system uses that utility’s notice.

The state rule does not name a garage or a dealership

R.61-58.7(F) sorts a cross connection by hazard. Section (2) calls a low hazard a connection to another water source that is not hazardous to health and is not cross-connected inside its own system with a potentially dangerous substance. The minimum it names there is an approved double check valve assembly or a pressure vacuum breaker, except for the residential lawn policy in section (3). Section (4) calls a high hazard a connection to a service or other water system that has or may have any material dangerous to health. The protection it names is an air gap or an approved reduced pressure principle assembly.

A text reading of the regulation PDF on November 16, 2026 did not contain automotive garage, car dealership, auto repair garage, or oil changing garage. Section (F) does not print a garage rule or a day count that applies only to a garage or a dealership. The annual test in section (7) is the test for an assembly installed to protect the public system, except for the residential lawn policy in section (3). It is not a separate garage schedule. The SCDES program page describes the cross-connection program and the tester course. The retrieved text of that page did not contain those words.

Where the words appear

What each file checked on November 16, 2026 says about an automotive garage or a car dealership. The notice for the account controls if a cell and the letter disagree.
Source Garage or dealership line Assembly that line names
R.61-58.7(F) Does not use automotive garage, car dealership, auto repair garage, or oil changing garage. By hazard, in sections (2) and (4). No garage row and no dealership row.
Greer CPW, plan amended April 2025, section 5.2 Car dealerships and automotive garages are on the common low-hazard list. The list says “include but not limited to.” Car washes are on the common high-hazard list in the same section. A double check valve assembly, ASSE 1015, for the low-hazard category, subject to the on-site adjustment in that section.
Anderson Electric City, September 2008 policy, Table 1 Auto garages and shops are their own low-hazard line. Car washes are a different low-hazard line. Gas stations are a different low-hazard line. The table does not print car dealership. The coordinator chooses. A low hazard may use a double check valve assembly or one of the high-hazard devices.
Seneca Light & Water, manual revised October 2021 Auto repair garages and oil changing garages are on the reduced-pressure bullet. The public page does not use those words. That bullet says a reduced pressure assembly is required on the uses it names. The supervisor still names the device.

A car wash stays on its own line. Greer CPW’s section 5.2 keeps car washes on the common high-hazard list. Anderson’s table keeps car washes on a low-hazard line other than auto garages and shops. Seneca’s reduced-pressure bullet names car washes together with auto repair garages and oil changing garages. Car wash backflow is that comparison. This page does not give the car-wash mark to a garage, and it does not give a garage mark to a car wash.

Greer CPW

Section 5.2 of the cross-connection control plan amended April 2025 says a reduced pressure principle assembly (ASSE 1013) is used for a high hazard, and a double check valve assembly (ASSE 1015) is used for a low hazard. The plan was read from the scan. Common low-hazard facilities “include but not limited to” a list that includes car dealerships and automotive garages. The same list includes restaurants, office buildings, and banks, and it continues with other facility types printed in that section. A car dealership is on the low-hazard list. An automotive garage is on the low-hazard list. Neither name is on the common high-hazard list. Car washes are on that high-hazard list.

The same section says the containment protection requirements for the three hazard categories may be subject to adjustment based on the condition and configuration of the internal plumbing identified during the onsite inspection. The low-hazard mark is the list. It is not a sentence that the inspection cannot change the assembly. Greer CPW is the rest of that plan, including the ten-day report on a new assembly and the same-day report after a failure. Greenville County testers are General Testers from the July 9, 2026 SCDES list. That section of the report includes rows whose city is printed as Greer.

Appendix D is a partial list of typical facility types that require service-line protection. It says other facilities not on the list may still be required to install that protection, at the authority’s discretion. The appendix does not name a car dealership or an automotive garage. Item 12 is “Petroleum processing or storage plants.” Item 17 is “Car washes.” Neither item is the section 5.2 low-hazard list. The car-dealership classification, and the automotive-garage classification, are section 5.2.

The questionnaire in Appendix A is headed “CCC QUESTIONAIRE.” The form prints that spelling. Its mechanical-equipment checkboxes do not include an automotive garage or a car dealership. A checkbox labeled “Degreasing Equipment” is equipment the applicant marks. It is not the section 5.2 list. The test report in the same appendix has a blank, “Define Hazard,” and the examples in parentheses include car lot. Those examples do not print car dealership, automotive garage, or auto repair garage. A car lot on that blank is not the section 5.2 low-hazard list. That blank is a place to write the hazard for the assembly being tested.

Anderson’s table

Table 1 of the September 2008 Cross Connection Control Policy is a list of typical service connections and the hazard level the policy associates with each use. The policy says the list is not complete, that it is a guide for Electric City personnel, and that every service is evaluated on its own. A footnote says the hazard tables are based on an American Water Works Association standard.

“Auto Garages and Shops” is its own line on the low-hazard side of Table 1. “Car Washes” is a different low-hazard line. “Gas Stations” is a different low-hazard line. The table does not print car dealership, automotive garage, auto repair garage, or oil changing garage. The introduction, before the table, names car washes among uses associated with incidents. That sentence does not name an auto garage or a car dealership. It does not print a count.

The coordinator evaluates each facility and uses Table 1 as a guide. A high hazard requires an air gap, a reduced pressure principal assembly, or a pressure vacuum breaker that is not used where backpressure is expected. A low hazard may use any of those, or a double check valve assembly. The policy encourages an air gap for both when a physical separation is practical. The table’s low-hazard mark is the guide. It is not a sentence that every auto garage in the city receives a double check. Deadlines for the test form are on Anderson, Pickens, and Oconee. Anderson County testers are General Testers from the July 9, 2026 SCDES list.

Seneca Light & Water

The backflow prevention page says the Cross-Connection Control Supervisor will notify the customer which device in the procedure manual best protects the system. A text reading of that page on November 16, 2026 did not contain automotive garage, car dealership, auto repair garage, or oil changing garage.

The manual revised October 2021 puts auto repair garages and oil changing garages on the reduced pressure assembly bullet, together with other uses named in the same bullet. The bullet says that assembly is required on those uses, that it is a high-hazard device, and that it requires annual testing by a certified tester. The same bullet names car washes. It names one more facility type that is already on the high-hazard commercial page. This page does not repeat that name. The manual prints “oil changing garages.” The double-check bullet does not print auto repair garage or oil changing garage. The next bullet on the double-check assembly says every commercial customer applying for water service after January 1, 2009 has a double check valve assembly, unless the supervisor waives it as unnecessary. That sentence does not name a garage or a dealership. The manual says the supervisor names the device for the service. Seneca Light & Water is the installation section and the initial test that manual describes. Oconee County testers are the General Testers in that county on the July 9, 2026 list.

A row that does not name a garage

Section 7 of Powdersville Water’s cross-connection policy, revised September 2024, is a guide to selecting an assembly. It says the guide comes from past experience and that the health hazard should govern the final choice. The guide does not print automotive garage, car dealership, auto repair garage, or oil changing garage. The row labeled Degreasing equipment lists a double check valve assembly. The row labeled Petroleum processing or storage facilities lists a reduced-pressure principle assembly. Neither row names a garage or a dealership. Powdersville Water is the 90-day letter and the rest of that policy.

Section 7 of the City of Westminster’s Cross-Connection Control Policy, revised September 12, 2024, in the November 12, 2024 council packet, uses the same kind of guide. The section says the health hazard should govern the final choice. The guide does not print those garage or dealership words. The row labeled Degreasing equipment lists a double check valve assembly. The row labeled Petroleum processing or storage facilities lists a reduced-pressure principal assembly. The legend prints “Principal.” Neither row names a garage or a dealership. City of Westminster is the 90-day letter and the rest of the policy.

Files that do not use the words

A text reading on November 16, 2026 did not contain automotive garage, car dealership, auto repair garage, or oil changing garage in any of these files. Silence in the file is not a finding that the account has no assembly. Use the notice.

What to do with the letter

Hire a General Tester, the classification that may test for the public. County pages on this site copy that classification from the SCDES report printed July 9, 2026. Confirm the current card before you hire. A row on this site is not an appointment.

The letter names the assembly, the date, and where the report goes. How to read your notice is the reading for the forms Greenville Water, Spartanburg Water, and Anderson publish. A failed result is on Failed backflow test. A repair, and the retest after it, is on Backflow preventer repair. Who the Greenville Water, Spartanburg Water, and Anderson manuals count as a business account is on Backflow assembly testing.

The regulation does not set a price for the device or the test. None of the garage and dealership lines above print a test fee for a tester the customer hires. The cost guide is a third-party range for a test a customer hires. It is not a garage price, it is not a dealership price, and it is not a utility fee. Official links are on Resources.

Assembly testing for businesses Car wash backflow

Sources checked November 16, 2026: R.61-58 on des.sc.gov, including section 58.7(F); the SCDES program page; Greenville Water’s backflow page and the manual created November 10, 2025, including section 5-1; Spartanburg Water’s manual revised June 4, 2026, including section 7, the cross-connection page, and the commercial and industrial page; Anderson Electric City’s September 2008 policy, including the introduction, Table 1, and the device section that follows the table; Greer CPW’s cross-connection control plan amended April 2025, read from the scan, including section 5.2, the adjustment sentence, Appendix A’s questionnaire and test form, and Appendix D items 12 and 17; Seneca Light & Water’s backflow page and the manual revised October 2021, including the double-check and reduced-pressure bullets; Laurens County Water and Sewer Commission’s backflow page; the City of Clinton water distribution page; the City of Pickens public-works page; the City of Clemson water page and the backflow flyer; Easley Combined Utilities’ water page and the specifications with a March 2025 cover; Powdersville Water’s September 2024 cross-connection policy, including section 7; Blue Ridge Rural Water’s company policies PDF, section 14; Gaffney Board of Public Works’ water construction specifications; and the City of Westminster November 12, 2024 council packet, including the Cross-Connection Control Policy revised September 12, 2024, section 7.