Upstate South Carolina

Upstate Backflow

Annual backflow testing directory. Not a water utility.

Starr-Iva Water and Sewer District backflow testing

The forms page links a backflow report and does not say where to send the finished form. The form does not print a due date or a test fee. The water users agreement says the user will make no physical connection between a private water system and the district’s system.

Sources checked November 20, 2026.

If this page and the letter on the account disagree, follow the letter. Starr-Iva Water and Sewer District is not Anderson Electric City Utilities. Electric City’s 10-day return, 90-day return, and 20-business-day repair lines do not transfer to a Starr-Iva account. Powdersville Water and the Town of Pendleton buy from the same regional system this district names. Their clocks do not transfer either.

A text reading of R.61-58 on November 20, 2026 did not contain the word Starr. The annual test of a testable assembly is R.61-58.7(F). What is backflow testing is that rule. This district’s form does not print that schedule, and it does not print a number of minutes.

On November 20, 2026 the forms and reports page listed four files. The first label is “backflow report.” It links the Backflow Device Test Report Form. The file properties show producer iLovePDF and a creation time of April 10, 2026. The form itself does not print that date. It is not an adoption date and not a due date. The text layer in the PDF does not match the printed letters. The reading below is the scan.

The form has no letterhead. It does not print the district’s name, a mailing address, a phone number, an email, or a fax. The forms page says to call or stop by if the file you want is not listed. That sentence does not name an address for the finished report. The new-service page links the water users agreement and does not mention the test form.

How to read your notice walks through the forms other Upstate utilities publish. Use the form this menu links. Use the notice on the account for the date.

What the form asks for

The heading is BACKFLOW DEVICE TEST REPORT FORM. The blanks are:

  • Date
  • Account name or business name
  • Account address
  • Account number, and meter number
  • Device name, and model number
  • Serial number, and size
  • Device location
  • Tested by, printed
  • Check No. 1 and Check No. 2. Each column says to mark one: Leaked or Closed Tight. Each has a Diff Press blank. The same pair of columns is repeated for the test after repairs
  • A column headed Air-Inlet Valve or Relief Valve. It says “Opened at” a blank, then lbs., and the words Differential Pressure. The same lines are repeated for the test after repairs
  • #1 Gate or Ball and #2 Gate or Ball. Each says “Circle One,” and each says to mark one: Leaked or Closed Tight. The same pair is repeated for the test after repairs
  • A row for repairs and new materials, between the test before repairs and the test after repairs
  • A line that the data above are certified to be correct, then tester signature and certification number
  • Company name, and company telephone number
  • Category, with the labels General, Limited, and Inspector Tester
  • Method of testing, and test kit used
  • Comments

The form does not print a pass or fail line, a due date, a fee, a time of test, a line-pressure blank, or a gauge serial number. It does not print the abbreviations DC, RP, or PVB, and it does not print an ASSE number. The air-inlet column and the two check columns are blanks. They do not name the assembly. Double check versus reduced pressure is how the state rule splits those assemblies. Pressure vacuum breaker is the state rule for that device. Backflow test kits is what SCDES requires of the gauge. The “Test Kit Used” blank does not name a brand.

The category line prints General, Limited, and Inspector Tester. It does not print Manufacturer’s Agent. General vs Limited is the state card. Confirm the current card before you hire, and confirm with the district that the category on the form is one it will accept.

The repairs row does not print a number of days. Failed backflow test is how Greenville Water, Spartanburg Water, and Anderson treat a result that does not pass. Those clocks are not this form’s.

A private water system, and a pressure-reducing valve

The water users agreement is the file the new-service page and the forms page both link. The PDF properties show author clerk, Microsoft Word, and a creation time of November 3, 2023. The body does not print a revision date. The signature line is a blank day, a blank month, and 20 followed by a blank.

The agreement says the user will make no physical connection between any private water system and the district’s water system. It also says the user will not allow a connection or extension of the service line to supply another dwelling or residence that is not listed in the agreement. It says any violation of that provision is grounds for disconnection of the service, and that the district may inspect at any reasonable time to enforce the agreement. The same paragraph says meter tampering is grounds for disconnection. The paragraph does not name a well, an air gap, a double check, or a reduced pressure assembly, and it does not print a test. Auxiliary water and private wells is how Spartanburg Water and Anderson word a second supply. Those sentences are not this agreement.

A separate paragraph says the district is not responsible for damage to the user’s household water heaters or other plumbing fixtures as a direct result of work the district performs on its system. It says it is required that all existing users and new users install a pressure-reducing valve. The agreement prints that name in capitals. It does not name a backflow preventer or an expansion tank. What is a backflow preventer is the assembly on a cross connection. Thermal expansion is a different sentence in other manuals. This agreement does not use the word backflow.

The agreement prints “cut off value” where it recommends a valve on the user’s side of the meter, and again where it describes the district’s own valve. The last lines print “CUT OFF VALVE” in capitals: put one on your side of the meter, and do not tamper with the district’s meter cut-off valve. Those lines do not name a backflow assembly.

The general utility easement on the forms page grants the easement to “Starr Iva Water and Sewer District, Inc.” The website title uses a hyphen. The easement says the grantor shall not drill or operate any well or septic system inside the strip without the grantee’s written permission. That sentence is the easement. It also covers water, sewer, gas, and electric lines. It does not name a backflow assembly, and it is not the private-system sentence in the agreement. The stated consideration is $1.00 and other valid consideration.

Dollar amounts that are not a test fee

The rates and policies page says the rates below are the updated rates for 2025, and that bills are always due by the 10th of each month. That date is the water bill. The test form does not print it. A text reading of the rates page on November 20, 2026 did not contain the word backflow.

The standard residential lines print a monthly minimum of $26.75, with 0-500 gallons included, and $6.85 per 1,000 gallons over 500 gallons. The paragraph under that table prints “incuded.” It says each bill includes a bi-monthly fee of 30 cents per bill for a DHEC fee and a 50 cents meter replacement fee, and that Servline Insurance Leak Protection is an additional $2.15 per bill if you are enrolled. The heading of the example table prints 3-4". The tap section below it prints 3/4". Both characters are on the page.

The Cloverhill water and sewer table prints a minimum bill of $53.45, a 30 cents DHEC fee, a 50 cents meter replacement charge, and $2.15 for customers enrolled in Servline Leak Protection. It does not use the word backflow.

The 3/4-inch residential tap line says the $3500.00 includes the tap fee, the capacity fee, the administrative fee, and the deposit. The rows under it print an administrative fee of $50.00, a refundable deposit of $125.00, a 3/4-inch tap fee of $2525.00, and a capacity fee of $800.00. A tap of 1 inch or greater says it requires a quote. The return check or item fee is $35.00. The disconnection fee is $50.00. The meter-tampering fee prints “Cost +” and does not print a dollar amount. The industrial line requires a minimum of 400,000 gallons per day and prints 1.8 times the district’s wholesale purchase price per 1,000 gallons. None of those amounts is a price for a tester the customer hires.

The agreement’s penalty paragraph is a different file. It prints a ten percent penalty if the water charge is not paid on or by the due date, a shutoff if the charge is unpaid within seven days from the due date, and a reconnection fee determined and set by the board. It does not print the reconnection amount. It says that if the user has not paid within ninety days after the original due date, the district may remove the meter. It prints “will forfeiture” for the initial tap fee, and it says a reinstatement fee is charged at the board’s discretion. It does not print that fee. The $50.00 disconnection fee on the rates page is the rates page. This page does not treat it as the reconnection amount the agreement leaves to the board.

The agreement offers water-leak insurance through Servline and says the charges will reflect on each bill. It does not print a dollar amount. The ServLine page spells the district “Starr Iva Water.” It says all “eligble” customers will be transitioned beginning May 1st, 2019, and that the program covers qualifying leaks of $150 or greater, “occuring” on the property, up to $2500 once every 12 months. The charge it prints is $2.15 for the monthly billing period. Those amounts are the leak program. They are not a test fee. The cost guide is a third-party range for a test a customer hires. It is not a Starr-Iva fee.

Who the record says this system is

The 2025 water quality report, linked from the water-quality page, prints System #0420005. The PDF properties show author Chad Byars and a creation time of April 3, 2026. The report says the source of the water is the Anderson Joint Regional Water System that treats water from Lake Hartwell. A later table is headed Anderson Regional Joint (SC0420011). The two spellings are both in the report. The report says the district meets on the 2nd Tuesday of each month at 7:00 pm at 104 Roy Arnold Rd., Starr, SC, and it prints 864-352-6717. A text reading did not contain the word backflow. The opening says a lead service line inventory was completed in 2025. A later paragraph says the inventory was completed in 2024. Both sentences are in the report. The name Chad Byars is the PDF author property. It is not on the personnel page read the same day.

The about page and the drought page do not use the word backflow. The drought page says to click for the plan “if available.” No plan file was linked there on November 20, 2026.

The location page prints drive-thru hours of Monday through Thursday, 9am to 4pm, and Friday, 9am to 12pm, and a main number of 864-352-6717. The address on that page, and in the site footer, is 104 Roy Arnold Road, Starr, SC 29684. On November 20, 2026 the public pages still showed a banner that the office will be closed Monday, October 12th, for Columbus Day. That banner is not a test deadline.

The personnel page lists Josh Haney as General Manager at jhaney@siwater.net, Patrick Boykin as Asst. Manager Operations at pboykin@siwater.net, and Susan Pettigrew as Office Manager at spettigrew@siwater.net. It says the district cannot make changes to an account based on an email, and that you must call or come in. That sentence does not mention a test report.

The SCDES drinking-water record for Starr-Iva W/D, SC0420005, lists the principal county as Anderson and the primary source as SWP. Status is A. The activity date is 06-01-1977. The population row is type R, 11125. Service connections are CM 81 and RS 4683. The source row names SC0420011 Anderson Regional W/S, type CC, status A. The purchases table lists Anderson Regional Joint WS (SC0420011) as the seller and buyer facility P04112. The owner row, type OW, prints 864-352-6717, attention Bryan T Bates, 104 Roy Arnold Rd, Starr, SC 29684, and the emails pboykin@siwater.net, SPETTIGREW@SIWATER.NET, and BBATES@SIWATER.NET. Patrick Boykin’s row prints the job title ASST. MANAGER and does not print a phone on that row. Bryan T Bates’s row, type AC, prints the same phone, PO Box 39, Starr, SC 29684, and the emails BBATES@SIWATER.NET and SPETTIGREW@SIWATER.COM. Josh Haney’s name is not on that contact table. The test form does not say to email any of these addresses.

Anderson County testers are General Testers from the July 9, 2026 SCDES list. This site does not copy a tester list from the district. A row here is not an appointment. Confirm the card is still current, and confirm with the district that the tester’s category is one it will accept on the form above. An Anderson County address can be on a different water system. Use the name on the bill.

Official links are on Resources.

Anderson County testers Starr-Iva test form

Sources checked November 20, 2026: the forms and reports page, including the link labeled “backflow report”; the Backflow Device Test Report Form PDF (file properties: producer iLovePDF, created April 10, 2026), read from the scan because the text layer does not match the printed letters; the water users agreement PDF (file properties: author clerk, Microsoft Word, created November 3, 2023), also linked from the new-service page; the general utility easement PDF; the rates and policies page, including the residential, Cloverhill, tap, disconnection, tampering, and industrial lines; the ServLine leak-protection page; the 2025 water quality report PDF (file properties: author Chad Byars, created April 3, 2026); the about page and the drought page, which do not use the word backflow and did not link a drought-plan file; the location page and the personnel page; the SCDES drinking-water record SC0420005; and a text reading of R.61-58, which did not contain the word Starr. The October 12 office-closure banner was still on the public pages that day.