Backflow preventer repair in Upstate SC
On these three systems the customer usually arranges the repair and pays for it. A routine repair is not the same step as replacing the whole assembly. The state rule requires another test immediately after any repair. This page does not quote a repair price.
Sources checked October 20, 2026.
If this page and the letter on your account disagree, follow the letter and the manual it cites. What is backflow testing is the annual-test rule. The day counts after a result that does not pass are on Failed backflow test. This page is who does the repair, when the manuals still call it a repair, and what has to happen before the assembly is back in service.
The customer arranges the repair
R.61-58.7(F)(7)(c) says every backflow prevention assembly is tested immediately after repairs of any kind. The regulation names the retest. It does not name a trade that is allowed to open the assembly, and it does not print a price.
On the three utilities that publish a manual, the customer is the one who keeps the assembly working:
- Greenville Water section 2-4 of the Cross Connection Control Manual (PDF created November 10, 2025) says the customer shall install, test, and maintain the assemblies Greenville Water, the health official, or the authority having jurisdiction requires. The customer is responsible for all costs of purchase, installation, testing, and maintenance, including when the customer does not own the piping past the service connection. Questions in the manual go to the Cross Connection Control Department at (864) 241-6100.
- Spartanburg Water section 5, item 2, of the manual revised June 4, 2026 (PDF created June 5, 2026) says the water user, at the water user’s expense, installs, tests as required, and maintains the approved devices Spartanburg Water’s policy requires. Section 5, item 1, says failure to install, have tested, and maintain an assembly Spartanburg Water required in writing can be grounds for discontinuing service.
- Anderson’s September 2008 policy says the customer shall install, test, and maintain the backflow systems, and that a water user with a cross connection or a potential one installs, has tested, and maintains an approved device at the water user’s expense. The policy says it can change and that the customer is responsible for the current copy. Questions in the policy go to the Cross Connection Control Coordinator at (864) 231-5230.
An SCDES tester card is the credential for the test. General vs Limited is how those cards differ. Installing or replacing an assembly for hire can be a separate question for the South Carolina Department of Labor, Licensing and Regulation and for the local plumbing official. This page does not decide that question.
Utility-owned dual checks are a different device
A residential dual check is not the testable assembly this page is about. Spartanburg Water section 6 says a residential customer with a 3/4-inch to 1-inch service will have a residential dual check installed by Spartanburg Water. The definitions section says replacement of those devices coincides with the meter change-out schedule used by Field Technical Services. Section 10.1 says a low-hazard residential lawn-irrigation dual check is replaced with the meter change-out program or if the assembly malfunctions.
Greenville Water section 5-3.2 says replacement of the internal parts of the dual check on a new residential irrigation meter setter is performed by Greenville Water once every thirty years. Anderson’s typical single-family domestic service without in-ground irrigation is protected by a residential dual check that Electric City installs and maintains at no additional expense to the customer. Lawn schedules for the testable case are on Irrigation backflow testing.
A repair is not always a replacement
Greenville Water section 4-2 is the split. If Greenville Water has determined that an existing assembly will protect the potable supply, it may remain in service. When it becomes necessary to replace the assembly, or to change its size, the current manual’s procedures apply. The same section says routine maintenance and repairs are not included under that replacement requirement. If Greenville Water determines that the existing assembly shall be replaced with one that meets current requirements, the customer does that replacement at the customer’s expense.
Spartanburg Water section 11.2(c) uses both words. Customers whose required assemblies do not meet Spartanburg Water’s requirements replace them with assemblies that do. Failing assemblies are repaired or replaced. Section 10.4 says failing assemblies that require replacement follow the completion schedule in the test-failures section.
Anderson’s current-customer section says a device that does not meet the criteria for a properly functioning device is repaired or replaced and retested. The policy does not print a parts list, and it does not say which failure can be repaired and which one requires a new assembly.
A replacement has to be an assembly the state still approves. The SCDES program page says assemblies used in South Carolina must be on SCDES’s list. The January 1, 2026 list says SCDES may add an assembly or remove one. The same notice says that if a serious defect is found at the first inspection after installation, or at a later inspection, SCDES asks to be notified so it can review that assembly’s approved status. Where the three manuals place a new assembly, and who installs it, is on Backflow preventer installation.
Keeping water on while the assembly is open
The January 1, 2026 approved-assembly notice says bypass piping is not permitted unless the bypass has an approved assembly similar to the main-line assembly. It also says that in many cases two approved assemblies are installed so water service is not interrupted during testing or repair.
Greenville Water section 5-4.4 and Spartanburg Water section 9.3 say the same thing about a bypass: none, unless an equal assembly is in the bypass. Both manuals say a customer who cannot shut the service off to test or repair the assembly should install an assembly in parallel, or a separate parallel service line with its own protection.
Spartanburg Water section 9.6 says no assembly is removed, bypassed, or downgraded without prior written approval. Section 6 says service may be discontinued if a required assembly has been removed or bypassed. Anderson’s installation section does not allow a branch, tap, tee, wye, or bypass between the meter and the device. How those sentences differ from a fire-line detector bypass, and from Powdersville Water’s parallel-installation section, is on Bypass and parallel assemblies.
What the form records
SCDES’s sample test form prints an initial test, a repairs block, and a final test. The form says many jurisdictions require their own form.
- Greenville Water’s blank field test form has an initial test, a row labeled “Repairs And New Materials,” and a test after repairs. The certification line says “Above Date Certified to be Correct.” It does not say the signer performed the repair. The form prints “Forms Must be Returned to Greenville Water System within 7 Days of Test.”
- Spartanburg Water’s field test and maintenance report has a test before repair, a repair-and-new-materials block with a date in each column, and a test after repair. The tester’s sentence says the signer certifies that the information is correct and that the test and the repairs were performed by the signer, as certified by the South Carolina Department of Health and Environmental Control as a General Tester or Limited Tester. The form does not say “SCDES.” Current tester cards are SCDES cards.
- Anderson’s appendix says that if a valve leaked, the device is repaired and retested until there are no leaks, and that the repairs go on the row labeled “Repairs and New Materials.”
A field-by-field reading of those forms is on How to read your notice. The pass or fail numbers Anderson prints, and the fact that the Greenville Water and Spartanburg Water manuals do not print those bands, are on RPZ testing and Double check versus reduced pressure.
The test right after the repair
The state rule is immediate: section (7)(c) says the assembly is tested immediately after repairs of any kind. The utility manuals then set how soon the repaired or replaced assembly, and the report, have to reach the utility. The full clocks, the extensions, and the non-compliance fees are on Failed backflow test. The short version from the same documents:
- Greenville Water section 7-2: if the assembly fails and cannot be repaired immediately — the manual’s example is repair parts on order — the tester returns a report explaining the failure the same day. After the repair, the assembly is tested immediately and the completed report goes back the same day.
- Spartanburg Water section 10.3: failing assemblies are repaired or replaced, completely retested, and the reports submitted within 10 business days of the test failure, unless a written extension is granted. The request for that extension is made within 3 business days of the failure. Section 11.2(c) says failing assemblies are repaired or replaced within ten days after notification by Spartanburg Water, or an extension of time. If those two sections read as different clocks, follow the letter and the manual.
- Anderson: defective devices are repaired or replaced as soon as possible, and no later than 20 business days after the failed test. The appendix says a leak is repaired and retested until there are no leaks.
Greenville Water section 4-3 says that if the device is non-compliant, Greenville Water will hire a third-party vendor to complete the test, and that the cost of the necessary repairs will be applied to the account. Spartanburg Water section 10.4 says the non-compliant customer assumes Spartanburg Water’s costs for testing, repairing, retesting, or replacement, plus a $50 administrative fee, added to the water bill. Those sentences are about work the utility arranges after non-compliance. They are not a price for a repair the customer hires.
A repair price is not on these documents
The three manuals do not print a dollar amount for a repair the customer arranges. The cost guide keeps a third-party range for the test itself, labeled as that publisher’s range. It is not a repair quote. Ask whoever does the work to put the repair, and any return visit, in writing.
If your utility is not one of these three
Repair language for Greer CPW, Seneca Light & Water, and Easley Combined Utilities is on those pages. This page does not add a repair rule for a utility whose document is not cited here. Use the letter on the account.
A dedicated fire line is a different assembly. How the three manuals treat it is on Fire-line backflow.
General Testers with an address in a county are listed for Greenville, Spartanburg, Anderson, Pickens, Oconee, Laurens, and Cherokee. A row on this site is the SCDES tester list. It is not a list of repair shops, and it is not an appointment. Confirm the current SCDES card before you hire.
Official links are on Resources.
Failed-test clocks Find a Greenville County tester
Sources checked October 20, 2026: R.61-58.7(F) on des.sc.gov; the SCDES program page; the January 1, 2026 approved-assembly list; the SCDES sample test form; Greenville Water’s November 10, 2025 manual and blank test form; Spartanburg Water’s manual revised June 4, 2026 and its field test report; Anderson Electric City’s September 2008 cross-connection policy.