Master-metered and bulk water accounts in Anderson
The policy’s appendix says a bulk water system means a master-metered system. That account is a public water system taking water through a service connection with Electric City Utilities, and it can include an apartment, a condominium, a mobile home park, or a subdivision served by another utility. A complex on one meter is treated as that account.
Sources checked November 21, 2026.
If this page and the letter on the account disagree, follow the letter. The definition below is the City of Anderson / Electric City Utilities Cross Connection Control Policy, September 2008 revision. Spartanburg Water uses “multi-family” and “multi-dwelling” for a different customer line. Powdersville Water uses “master metered” for water entering its own system. Those sentences stay on their pages. Residential backflow testing is the single-family dual check. This page is the account the Anderson policy calls master-metered.
The policy says it can change, and that the customer is responsible for the current copy. Questions in the policy go to the Cross Connection Control Coordinator at (864) 231-5230. The water department page lists the policy under Water Operations Resources. On November 21, 2026 that page did not print the master-metered definition. The PDF properties show author Christopher Eleazer, Microsoft Word, and a creation time of December 18, 2009. The cover line is September 2008 Revision. The file date is not a second revision date.
What the appendix calls this account
The appendix entry is Master-metered System. It says a master-metered system is a public water system, as defined by state and federal laws and regulations, that receives drinking water through a service connection with the City of Anderson / Electric City Utilities’ distribution system. The same entry says a master-metered system can include multi-family dwellings, such as apartment and condominium complexes and mobile home parks and subdivisions that are served by other utility companies not under the direct control of the City of Anderson / Electric City Utilities.
The appendix entry Bulk Water System says see Master-metered System. Table 1 prints the same pair on one low-hazard line: “Master-metered Systems for Water Distribution (public and private) (a.k.a. – bulk water systems).”
The policy’s own public-water-system definition says a drinking water system serving a single private residence or dwelling is not a public water system. It also says a separately owned water system with its source of supply from another waterworks system shall be a separate public water system so long as the two are not inner-connected. The policy prints “inner-connected.” R.61-58 definition (150) is the state sentence. It ends at “shall be a separate public water system.” The November 21, 2026 text of definition (150) does not add the inner-connected clause. Anderson’s master-metered entry points at “state and federal laws and regulations” and then adds the apartment, condominium, mobile home park, and subdivision examples. Those examples are the policy.
Definition (30) in the same regulation file says a community water system serves at least fifteen service connections used by year-round residents or regularly serves at least twenty-five year-round residents, and that this may include subdivisions, municipalities, mobile home parks, and apartments. That sentence does not name an assembly. Definition (36) says a consecutive system is a public water system that receives some or all of its finished water from one or more wholesale systems. Delivery may be through a direct connection or through the distribution system of one or more consecutive systems. The Anderson definition is the service connection on Electric City’s system. Definition (36) is the system that receives the water.
One meter, or a meter for each unit
Three appendix entries split the building by the meter.
Residential is a customer account associated with a dwelling that serves as a shelter for a single family. The entry includes duplexes and multi-plexes that are supplied water via an individual meter for each individual unit. It says properties owned by a company or multiple cooperative owners, and it gives homeowners associations as the example, are classified as Commercial.
Commercial is a customer account associated with a customer other than a single-family residence. The entry includes home-based businesses, standalone businesses, duplexes and multi-plexes that are supplied water via only one meter, subdivision homeowner associations, and industries.
Multi-occupancy Structure is apartments, condominiums, townhouses, dormitories, and multi-plexes, and the entry prints duplexes and tri-plexes, that are served by only one meter for the entire complex. It says this type of arrangement will be treated as a master-metered system. Community-type Structure says see Multi-occupancy Structure.
The policy prints all three entries. It does not say which label controls when a one-meter duplex can be read under the commercial entry and under the multi-occupancy entry. Use the notice on the account.
Where Table 1 puts the account
The table introduction says the list is not complete and is meant only as a guide for Electric City Utilities personnel. Every service is evaluated individually, and the hazard level is determined case by case. The footnote on the table says the hazard tables are based on an American Water Works Association standard. The footnote does not print the standard’s number.
On the low-hazard side, master-metered systems for water distribution, public and private, are one line. Multi-family housing complexes are a separate line. Hotels, motels, and inns are a separate line. Swimming pools, public and private, are a separate line. The coordinator section says the Cross Connection Control Coordinator evaluates each facility case by case, and that Table 1 is the guide.
A high hazard, in the device section, requires an air gap separation, a reduced pressure principal backflow prevention assembly, or a pressure vacuum breaker assembly. The policy prints “Principal” in that sentence. The acronym line later prints “Reduced Pressure Principle.” The pressure vacuum breaker sentence says it is not used where there will be backpressure. A low hazard can be any of those devices or a double check valve assembly. Air gap separation is the gap. Double check versus reduced pressure is the split between the two assemblies. Pressure vacuum breaker is the height and the backpressure limit in the state rule. The coordinator still chooses.
The device section does not print a dollar amount for that choice. The master-metered definition does not print a test fee.
The single-family dual check is a different section
“Residential Services (Typical) for Single Family Structures” says that for a residential service without an in-ground irrigation system, Electric City Utilities supplies the protection at or near the meter and will install and maintain these devices at no additional expense to the customer. Standard residential domestic services get a residential dual check approved under ASSE 1024, on a meter yoke or as a stand-alone device, on new or renewed services. That section does not name a master-metered system, an apartment, or a mobile home park. The “no additional expense” sentence stays in that section. Who installs the dual check on a house is on Backflow preventer installation.
The new-construction paragraph says the only exemptions to those requirements are single-family residential customers and in-ground irrigation systems for residential and commercial customers. It does not name a master-metered system. For new construction that is not in that exemption, the same paragraph requires a set of plans showing meter locations, service size, the type of backflow prevention device including make and model, the size of the device, and its location. In-ground irrigation stays on Irrigation backflow testing. The irrigation section still sets the device from Table 1.
The test clock the definition does not rewrite
Customers who already have backflow protection receive a mailed reminder to test annually. The policy says the utility tries to send it no later than the beginning of the month the test is due. The test form goes to the coordinator within 10 days after the test, and the form has to arrive no later than 90 days after the customer received it, or 45 days for in-ground irrigation. A defective device is repaired or replaced as soon as possible and no later than 20 business days after the failed test. Those sentences are the general customer rules. They do not name a master-metered system, and the master-metered entry does not print a different interval. The same sections say the customer will be subject to any applicable reconnection fees. They do not print the dollar amount. The clocks and the three-day retest after service is restored are on Anderson, Pickens, and Oconee. What a result that does not pass requires is on Failed backflow test.
The policy still says SC DHEC. Current tester cards are SCDES cards. General vs Limited is the state card. Anderson County testers are General Testers from the July 9, 2026 SCDES list. A row on this site is not an appointment. Confirm the card is still current, and confirm with the utility that the tester’s category is one it will accept. How to read your notice is the letter and the form. The cost guide is a third-party range for a test a customer hires. It is not an Anderson fee.
The same words in other files
R.61-58.7(F) is the cross-connection rule. A text reading of section (F) on November 21, 2026 did not contain master-metered, bulk water, apartment, mobile home, or multi-family. The annual test of a testable assembly is that section. What is backflow testing is the rule. Anderson’s table does not replace it, and section (F) does not print Anderson’s customer categories.
R.61-58.1(B)(11) says piping associated with a service connection will not require a construction permit when four conditions are met. One condition is that the customer consists of only a single house, single mobile home, single building, or a multiple-building complex under single ownership with no rental units, and the examples in that condition are schools or industry. The next condition says the customer is not a shopping mall, a multiple-building complex where there will be several owners or renters, and the examples are an apartment complex, a condominium complex, a mobile home park, a campground, an industrial park, or a business park, or a marina. That paragraph is a construction permit for piping. It does not name an assembly, a test interval, or a fee.
R.61-58.2(B)(1) uses “Master Meter” in a groundwater quantity rule. A system with an additional source, and the regulation prints “Surface Water Plant or Master Meter,” is not required to have two groundwater sources. The capacity from that additional source is included in the quantity analysis. That sentence is well capacity. It is not a field test and not Table 1.
Spartanburg Water’s manual, revised June 4, 2026, and created June 5, 2026, does not use master-metered or bulk water. The customer definition says a single-family dwelling requires a dual check device, and that a commercial, industrial, or multi-family site is evaluated for the degree of hazard and then receives the appropriate testable assembly. Section 6 repeats that split: a residential customer with a 3/4-inch to 1-inch service gets a residential dual check installed by Spartanburg Water, and a multi-dwelling customer gets an approved testable assembly based on the hazard the cross-connection technicians identify. Section 10.2 says all existing approved backflow assemblies are tested annually, excluding low-hazard residential lawn irrigation systems. The letter tiers are on Spartanburg Water. Anderson’s one-meter definition does not transfer to a Spartanburg Water account.
Greenville Water’s manual created November 10, 2025 did not contain master-metered, bulk water, apartment, mobile home, duplex, multi-family, or dwelling in a text reading on November 21, 2026. Seneca Light & Water’s backflow manual, titled October 2021, did not contain those words in a text reading the same day. A bulk-usage permit for a water-hauling vehicle is on Temporary hydrant meters. Anderson’s bulk-water line is the Table 1 account.
Powdersville Water’s September 2024 policy, cover line “Revised September 2024,” uses the words in section 2.1. Section 2.1(3) says the treatment facilities are owned and controlled by other entities, that the water is master metered into the Powdersville Water system at various locations, and that Powdersville Water is a consecutive system. Section 2.1(4) says the distribution system includes the network of pipes used for the delivery of water from the source master meter to the customer’s water meter. That is Powdersville Water’s own supply. It is not a customer category for an apartment on Electric City’s system. Powdersville Water’s 90-day letter stays on Powdersville Water.
The City of Westminster’s Cross-Connection Control Policy, revised September 12, 2024, is in the November 12, 2024 council packet. Section 2.1(3) says the treatment facilities are owned and controlled by other entities, that the water is master metered into the city system at various locations, and that the city is a consecutive system. Section 2.1(4) says the distribution system includes the pipes from the source master meter to the customer’s water meter. The policy prints “THE CITY” in those sentences. A text reading of that policy on November 21, 2026 did not find a master-metered customer category for an apartment. The rest of the Westminster rules stay on City of Westminster. Westminster’s 90-day letter does not transfer to an Anderson account.
Official links are on Resources.
Anderson County testers Residential testing
Sources checked November 21, 2026: the City of Anderson / Electric City Utilities Cross Connection Control Policy, September 2008 revision (file properties: author Christopher Eleazer, Microsoft Word, created December 18, 2009), including Table 1, the device section, the new-construction paragraph, the single-family residential section, and the appendix entries for master-metered system, bulk water system, residential, commercial, multi-occupancy structure, community-type structure, and public water system; the City of Anderson water department page, which links that policy and does not print the master-metered definition; R.61-58 definitions (30), (36), and (150), R.61-58.1(B)(11), R.61-58.2(B)(1), and a text reading of R.61-58.7(F), which did not contain master-metered, bulk water, apartment, mobile home, or multi-family; Spartanburg Water’s cross-connection manual revised June 4, 2026 (file properties: created June 5, 2026), sections 4, 6, and 10.2; Greenville Water’s manual created November 10, 2025, which did not contain those customer words; Seneca Light & Water’s October 2021 backflow manual, which did not contain those words; Powdersville Water’s September 2024 policy, section 2.1; and the City of Westminster Cross-Connection Control Policy revised September 12, 2024, in the November 12, 2024 council packet (file properties: author Jennifer Adams, created November 8, 2024), section 2.1. That Westminster policy did not print a master-metered customer category.