A customer does not run this test. A certified tester does, with the gauge in hand. SCDES publishes a 2025 three-valve sheet and a 2025 five-valve sheet for a reduced pressure assembly. This page follows those two sheets in the order each one prints. It does not add a step that only the other sheet has.

Sources checked October 24, 2026.

If the sheet in the tester’s hand and this page disagree, follow the sheet. RPZ testing is what the assembly is, where the state rule and the published Upstate manuals require one, and what the written report records. Backflow test kits is what the regulation requires the gauge to be. This page is only the field order.

Two sheets, two orders

The SCDES program page links both files in its downloads list. On October 24, 2026 the labels were “5 Valve Test Procedures” and “3 Valve Test Procedures.”

Each file has four sheets. The first is a double check by pressure differential, the second is a double check by direction of flow, and the third is a pressure vacuum breaker by direction of flow. The reduced-pressure sheet is the last sheet in each file. Those other three sheets are not reprinted here.

The three-valve reduced-pressure title prints “3-Valve Reduced Pressure Backflow Preventer (RPBP) (Pressure Differential).” The five-valve title prints “5-Valve Test Procedure for a Reduced Pressure Principal Backflow Preventer (RP)(Pres. Differential test).” The five-valve title uses Principal. This page keeps the title each sheet prints.

Several headings print a number, then “psid,” then a greater-than sign, as in “5psid>.” That token is quoted below as printed. The five-valve sheet is the one that also writes a sentence, “5 PSID or Above.”

Use the sheet that matches the gauge. Do not move a step from one sheet onto the other. What an Upstate manual requires after a report, and Anderson’s passing bands, stay on RPZ testing. These two sheets do not print a maximum for check number 1, check number 2, or the relief valve.

Three-valve sheet

Preparing to test the assembly

  1. Notify the customer.
  2. Inspect the area for safety.
  3. Determine if the assembly is approved and appropriate.
  4. Record the make, model number, serial number, and assembly type.

The sheet does not say where the approved-assembly list lives. That list is part of what backflow testing is.

Flushing the test cocks

  1. Place test adapters on the test cocks, if applicable.
  2. Open test cock number 4 and let it flow.
  3. Open test cock number 1, then close it.
  4. Open test cock number 2, then close it.
  5. Open test cock number 3, then close it.
  6. Close test cock number 4.
  7. Make sure the high and low valves on the gauge are closed. The sheet prints two exclamation marks on that line.

The next line has no number of its own: open the vent/bypass valve on the gauge.

  1. Close shutoff valve number 2.

Attaching the test kit

  1. Attach the high-side hose to test cock number 2.
  2. Attach the low-side hose to test cock number 3.
  3. Slowly open test cock number 3.
  4. Open the low-side control valve and leave it open.
  5. Open test cock number 2.
  6. Open the high-side control valve, bleed the air, then close it.
  7. Close the low-side control valve.
  8. Close the vent/bypass valve on the gauge.

This attaching block does not record system pressure. The five-valve sheet does, in its own attaching block.

Test number 1: tightness of number 2 shutoff

The heading prints “SHUT OF VALVE,” without the second f. The note under the steps prints “Shut Off Valve.”

  1. Attach the vent/bypass hose to test cock number 4.
  2. Open the high-side control valve.
  3. Open the vent/bypass valve on the gauge.
  4. Loosen the vent/bypass hose at test cock number 4 to bleed the air, then tighten it.
  5. Open test cock number 4.
  6. Close test cock number 2, and pause to allow the gauge to readjust.
  7. Read the gauge and record it. The sheet’s example is “Closed Tight.”

If the pressure differential gauge remains steady, record shutoff valve number 2 as tight. The three-valve sheet does not print a second sentence for a gauge that falls.

Test number 2: backpressure test for check number 2

The sheet prints one condition, not a series of valve moves. If the gauge remains steady during test number 1 and no water is dripping from the relief valve, check valve number 2 is considered tight.

Test number 3: differential value on check number 1

The heading prints “(5psid>).” It does not print the five-valve sentence that says to record the check as tight at 5 PSID or above.

  1. Close test cock number 4.
  2. Close the high control valve.
  3. Remove the vent/bypass hose from test cock number 4.
  4. Open test cock number 2.
  5. Open the low-side control valve to cause the reading to rise, then close it. The sheet calls this basically a reset.

Read the gauge and record the value. That line is not numbered.

Test number 4: relief valve opening value

  1. Close the vent/bypass valve on the gauge.
  2. Open the high control valve.
  3. Open the low valve slowly. The sheet spells that word with hyphens: S-L-O-W-L-Y.
  4. Place the top of your hand under the relief. The sheet prints “(2psid>)” on this line.
  5. As soon as you feel the first drop of water on your hand, read the gauge and record the value.
  6. Close the high and low control valves on the gauge.

Test number 5: tightness of check number 2

The heading prints “(1psid>)” and “(SC Unique).” The five-valve sheet does not print “SC Unique” on its check-number-2 test.

  1. Close test cock number 2.
  2. Close test cock number 3.
  3. Remove the low-side hose from test cock number 3 and place it on test cock number 4.
  4. Remove the high-side hose from test cock number 2 and place it on test cock number 3.
  5. Open test cock number 3.
  6. Open the vent/bypass valve on the gauge.
  7. Open the high-side control valve, bleed the air, then close it.
  8. Open test cock number 4.
  9. Open the low-side control valve, bleed the air, then close it.
  10. Close the vent/bypass valve on the gauge.
  11. Read the gauge and record the value. The sheet prints “(1psid>)” on this line.

Restore the system

  1. Close all test cocks.
  2. Remove the hoses.
  3. Open all valves on the test kit and drain the water.
  4. Restore water by opening shutoff valve number 2.

The sheet does not say to open shutoff valve number 1 in this restore block. It was not closed in the steps above.

Detector assemblies on the three-valve sheet

To verify flow through the bypass, open test cock number 4 and the meter should move.

For an RPDA Type I, test the main assembly as normal using approved RP procedures, and isolate the bypass before that test. Then test the bypass assembly separately using approved RP procedures.

For an RPDA Type II, test the mainline RP per normal approved procedures, and isolate the bypass before testing the main assembly. Test the bypass single check with the normal approved check-number-2 procedures. The sheet does not repeat those steps under the detector note. The check-number-2 test printed on this sheet is test number 5 above.

The sheet says to isolate the bypass. It does not name the valve that does that.

Five-valve sheet

The preparing lines are not numbered:

  • Notify the customer.
  • Inspect the area for safety.
  • Determine if the assembly is approved and appropriate.
  • Record the make, model number, serial number, and assembly type.

Flushing the test cocks

  1. Place test adapters on test cocks 1, 2, 3, and 4.
  2. Open test cock number 4 and let it flow.
  3. Open test cock number 1, then close it.
  4. Open test cock number 2, then close it.
  5. Open test cock number 3, then close it.
  6. Close test cock number 4.
  7. Make sure all five valves on the gauge are closed. The sheet prints three exclamation marks on that line.

This flushing block does not close shutoff valve number 2. On this sheet that close is the first step of test number 1, after the kit is attached.

Attaching the test kit

  1. Attach the high-side hose to test cock number 2.
  2. Attach the low-side hose to test cock number 3.
  3. Slowly open test cock number 3.
  4. Open the low-side bleed valve and leave it open.
  5. Open test cock number 2.
  6. Open the high-side bleed valve, bleed the air, then close it.
  7. Close the low-side bleed valve.
  8. Attach the by-pass hose to test cock number 4.
  9. Open the high-side control valve one full turn.
  10. Open the by-pass valve a quarter turn.
  11. Loosen the by-pass hose at test cock number 4 to bleed the air, then tighten it.
  12. Slowly open the low-side bleed valve to cause the differential reading to rise, then close it. The sheet calls this a reset, and it spells the slow opening with hyphens.
  13. Record system pressure, if required.

Test number 1: tightness of number 2 shutoff

The heading prints “SHUT OFF VALVE.”

  1. Close shutoff valve number 2.
  2. Open test cock number 4.
  3. Close test cock number 2, and pause to allow the gauge to readjust.
  4. Read the gauge and record it. The sheet’s example is “Closed Tight.”

The sheet then prints two results:

  • If the pressure differential gauge remains steady, record shutoff valve number 2 as tight. The sheet says the test procedure passes.
  • If the pressure differential gauge drops to zero and no water is coming from the relief valve, shutoff valve number 2 is not holding. The assembly is not in a static condition.

That second bullet is about the shutoff, not a sentence that names a repair deadline. What Greenville Water, Spartanburg Water, and Anderson require after a report that does not pass is on Failed backflow test. The three-valve sheet does not print this zero reading.

Test number 2: backpressure on check number 2

If the gauge is steady during test number 1 and no water is dripping from the relief valve, check valve number 2 is considered tight. The five-valve heading says “backpressure on” the check. The three-valve heading says “backpressure test for” the check.

Test number 3: differential value on check number 1

The heading prints “(5psid>).”

  1. Close the by-pass valve. The sheet prints that instruction twice on the same line, separated by a slash, with two exclamation marks after each one.
  2. Open test cock number 2.
  3. Open the low-side bleed valve to cause the reading to rise, then close the low-side bleed valve.

Read the gauge and record the value. That line is not numbered. If the pressure differential gauge reading is 5 PSID or above, record check valve number 1 as tight.

Test number 4: relief valve opening point

The heading prints “(2psid>).”

  1. Place the top of your hand under the relief.
  2. Open the low valve slowly, spelled with hyphens as on the three-valve sheet.
  3. As soon as you feel the first drop of water on your hand, read the gauge and record the value. The sheet prints “(2psid>)” on this line.

Close the low control valve. That line is not numbered. This test does not repeat the three-valve steps that close the vent/bypass valve, open the high control valve, and close both control valves.

Test number 5: tightness of check number 2

The heading prints “(1psid>).” It does not print “SC Unique.”

  1. Close test cock number 2.
  2. Close test cock number 3.
  3. Close test cock number 4.
  4. Remove the by-pass hose from test cock number 4.
  5. Remove the low-side hose from test cock number 3 and place it on test cock number 4.
  6. Remove the high-side hose from test cock number 2 and place it on test cock number 3.
  7. Open test cock number 3.
  8. Open the high-side bleed valve, bleed the air, then close it.
  9. Open test cock number 4.
  10. Open the low-side bleed valve, bleed the air, then close it.
  11. Read the gauge and record the value. The sheet numbers this last line 9, after the line numbered 10. It prints the value as “1pisd>,” with the letters in that order.

Restore the system

  1. Close all test cocks.
  2. Remove the hoses.
  3. Open all valves on the test kit and drain the water.
  4. Restore water by opening shutoff valve number 2 on the assembly.

Detector assemblies on the five-valve sheet

The five-valve note does not print the three-valve sentence about opening test cock number 4 so the meter moves.

For an RPDA Type I, test the main assembly as normal using approved RP procedures, and isolate the bypass before that test. Then test the bypass assembly separately using approved RP procedures.

For an RPDA Type II, test the mainline RP as normal using approved RP procedures, and isolate the bypass before testing the main assembly. Test the bypass single check with the normal approved check-number-2 procedures. On this sheet, the three-valve phrase “per normal approved procedures” is not the phrase in that line.

What neither sheet is

Neither sheet prints a price for the test, a utility fee, or how long the test takes. The cost guide keeps a third-party range separate from any utility fee. The annual written report is what backflow testing is. How to read the lines on a utility form is on How to read your notice.

The person who runs these steps for a customer is a General Tester. How that card differs from a Limited Tester, including the wet-lab test of a reduced pressure assembly, is on General vs Limited. What the regulation and the study guide require of the gauge is on Backflow test kit calibration. County lists copied from the July 9, 2026 SCDES report start at Greenville County. Confirm the current card before you hire. A row on this site is not an appointment.

Official links are on Resources.

RPZ testing Test kits

Sources checked October 24, 2026: the SCDES Cross Connection Control program page, including the downloads labeled “3 Valve Test Procedures” and “5 Valve Test Procedures”; the 2025 three-valve test-procedure PDF; the 2025 five-valve test-procedure PDF. The field order on this page is the reduced-pressure sheet in each of those files.