The letter on your account is the notice. The blank form is the report a tester fills in. This page reads the public forms line by line.

Sources checked October 14, 2026.

If this page and the letter on your account disagree, follow the letter and the manual it cites. What is backflow testing is the annual-test rule. The day counts and the fees are on the utility pages linked below.

The letter is not in the manual

On October 14, 2026 the public PDFs below did not include a blank of the customer letter:

  • Greenville Water’s Cross Connection Control Manual describes when a letter is mailed. The file’s properties record a creation date of November 10, 2025. The body does not include a sample letter.
  • Spartanburg Water’s manual revised June 4, 2026 lists “Letters” under attachments. The file is 18 pages. Section 13, thermal expansion, is on the page marked 17 of 18. What that section says is on Thermal expansion. The last page is headed “ATTACHMENTS” and does not include those letters.
  • Anderson’s September 2008 policy describes a mailed reminder. Appendix 2 is a sample test form, not a sample of the reminder letter.

Read the date, the service address, and the account printed on the letter you received. The sections below say only what each manual says that letter is for.

Greenville Water

Section 7-5 says Greenville Water mails notifications to the address on file for the account the device is associated with. The initial letter goes out 45 days before the device test due date. A third notice is mailed 15 days after the due date. The full schedule, including the $500 non-compliance fee in sections 4-3 and 7-5, is on Greenville Water.

Spartanburg Water

Section 10.2 says customers with backflow assemblies are sent a Tier 1 notification letter 30 days before the test is due. The due date is the last day of the month. Tier 2 and Tier 3, and the $50 administrative fee in section 10.4, are on Spartanburg Water.

Anderson Electric City Utilities

The “Current Cross Connection Customers” section says customers with protection in place receive a reminder notice by U.S. Mail to test annually, and that every effort is made to send it no later than the beginning of the month the test is due. The “Current Customers in Good Standing” paragraph says notification shall be made no later than the beginning of that month. The in-ground irrigation paragraphs say reminder letters go out about 30 days before the test is due. The policy says it can change and that the customer is responsible for the current copy. Those clocks are also on Anderson, Pickens, and Oconee.

Use the form that utility publishes

R.61-58.7(F)(7)(b) says the public water system receives a written report, submitted by the certified tester who made the test. SCDES’s sample test form prints this line: “This is a sample Test Report Form. Many Jurisdictions require use of their unique forms. Check with local Jurisdiction before testing to ensure correct forms are used.”

Greenville Water, Spartanburg Water, and Anderson each publish their own form. The state sample is the comparison at the end of this page.

Greenville Water’s blank form

The form linked from Greenville Water’s backflow prevention page is the Field Testing & Maintenance Report.

The form prints a return block: Greenville Water, Attn: Engineering Dept., P O Box 687, Greenville, SC 29602, (864) 241-6100. The backflow page lists the same mailing address, P.O. Box 687, Greenville, SC 29602, and lists 864-241-6000 as the main phone. The manual sends questions to the Cross Connection Control Department at (864) 241-6100, the number on the form. The same backflow page says certified testers upload results in the portal. The form itself prints a mailing address and the line “Forms Must be Returned to Greenville Water System within 7 Days of Test.”

The form prints these account and device lines. It does not define them. Copy the number that carries the same label on the letter or the bill.

Account Name, Date, Account Address
Three separate lines at the top of the form.
Account Number, Customer Number, Device Number, Meter Number
Four separate blanks. The form does not say that any one of them substitutes for another.
Device Name, Model Number, Serial Number, Device Size, Device Location, Meter Reading
Identity lines for the assembly. Meter Reading is its own blank, next to Model Number.
Tested By (Print Name)
A print line, separate from the signature at the bottom.

The result table has an Initial Test and a Test After Repairs, with a Repairs And New Materials row between them. Each test row has Check Valve #1, Check Valve #2, Relief Valve Or Air-Inlet, and two shutoff columns labeled “# 1 Gate or Ball” and “# 2 Gate or Ball,” with “Circle One” under the gate-or-ball headings. Check valves are marked Leaked or Closed Tight, with a Drop Across line. The relief valve or air inlet has “Opened at _____ LBS. Differential Pressure.” The form does not print the words “pass” or “fail.” Greenville Water’s manual, in the sections read for Failed backflow test, does not print psi bands. The pass or fail is the result the tester enters.

Under the table the form prints “Above Date Certified to be Correct,” then the 7-day return line. The signature block asks for Tester Signature, Certification Number, Company Name, Company Phone Number, and Test Category marked General or Limited. What those two categories mean on an SCDES card is on General vs Limited.

Section 7-2 of the manual uses a same-day return when an assembly fails and cannot be repaired immediately. That clock, next to the 7-day line on the form, is on Failed backflow test.

Spartanburg Water’s field report

The report linked from Spartanburg Water’s cross-connection page is the Backflow Prevention Assembly Field Testing and Maintenance Report.

The form prints this return block: Spartanburg Water, C&D Department, 301 South Avenue, Spartanburg, SC 29306, Phone (864) 253-9304, Fax (864) 596-4927. The cross-connection page lists a different contact for program questions: Matthew Jamison, Field Operations Manager, (864) 598-7213 or ccc@spartanburgwater.org. The June 4, 2026 manual says the tester transmits the report. Confirm the current channel with that contact if the form and the letter name different places to send it.

The header lines are Date, Account No., Meter No., Customer/Business Name, Customer Address, Customer Contact Person, and Customer Phone #.

Assembly Information is a set of checkboxes: RP, DCVA, DCDA, PVB. The same block asks for Size, Manufacturer, Model #, Serial #, and Location (hazard protected). Separate marks record Vertical or Horizontal, and Assembly By-passed Yes or No. A comments line sits above the results table.

The results table is Test Before Repair and Test After Repair. Check No. 1 and Check No. 2 are marked Leaked or Shut Tight, with a differential-pressure blank. The middle column is Differential Relief Valve or Air Inlet, “Open at” pounds of differential pressure. No. 1 and No. 2 are Gate or Ball, circle one, marked Leaked or Shut Tight. The Repairs And New Materials row has its own date blank in each column. The form does not print the words “pass” or “fail,” and the manual sections read for Failed backflow test do not print psi bands.

Below the table the form has a Test Method line, Direction of Flow or differential pressure, and a Test Kit Used line, vertical tube or differential, with a model blank. How the June 1, 2018 Bureau of Water letter treats a vertical-tube test, and what Anderson’s 2008 policy still prints, is on Double check versus reduced pressure.

The tester’s certification sentence says the test and repairs were performed by the signer as certified by the South Carolina Department of Health and Environmental Control as a General Tester or Limited Tester. The category line adds a third box: General Tester, Limited Tester, or Inspector-Tester. The form does not say “SCDES.” Card types are on General vs Limited.

The owner block is separate. It certifies that the assembly has been in constant use at the location in conformance with Spartanburg Water System policies, that it has not been removed or bypassed without notification and authorization by Spartanburg Water, and that a copy of the report has been retained. The owner signs and dates that block.

The form is labeled APPENDIX A-5. The PDF footer prints a Windows path whose folder name includes “2011 Aug Working Files.” The form does not print its own revision date. The manual revised June 4, 2026 is a separate file.

Anderson’s sample form

Appendix 2 of the September 2008 policy is titled “Backflow Device Test Report Form Sample.” The page after the form tells the tester what each line means. These definitions are Anderson’s, for Anderson’s form.

Date
The date the device is tested.
Customer Name/Business Name
The resident or business responsible for having the device.
Street Address
The address where the device is located.
Account Address
The address where the utility bill is mailed, if it differs from the street address.
Device Manufacturer
The business that manufactured the device.
Meter Number
The identification number stamped on the water meter.
Device Type
The instructions say to indicate a double check valve assembly (DCVA), a reduced pressure principle assembly (RP Assembly), or a pressure vacuum breaker assembly (PVB).
Meter Reading
The instructions say to write all numbers on the register, and that the readings display cubic feet.
Device Serial Number
The identification number stamped on the device.
Device Model Number
The model number assigned by the manufacturer.
Device Location
The instructions call this the physical location of the meter, and the examples they give are directly behind the meter, a distance and direction from the house, a location inside the building, or a dedicated fire-line pit.
Size
The size of the device in inches.
Tested By (PRINT)
The tester’s name, printed legibly.
Time of Test
The time of day the test takes place.
Name of Alarm Company Called
The instructions limit this line to devices on dedicated fire lines: the business called so it knows an alarm may sound during the test. Fire-line rules in the same policy are on [Fire-line backflow](/fire-line-backflow).
Tester Signature and Certification Number
The tester signs that the data are correct. The instructions call the number the current SC DHEC backflow prevention certification number. The 2008 form still prints “SC DHEC.”
Company Name, Company Telephone Number, Tester’s Cell Phone Number
Three separate lines. The cell-phone line is on the form, under the company telephone number.
Category
The form says “select one”: General, Limited, or Inspector. The instructions say to mark the certification type assigned by SC DHEC.
Method of Testing and Test Kit Used
The instructions say to indicate “Direction of Flow” or “Differential Pressure,” and to record the make and model of the differential gauge. The same appendix still describes a vertical-tube option for a double check. The later state letter, and the lines the 2025 procedure sheets still print, are on [Double check versus reduced pressure](/double-check-vs-rpz).
Comments
The instructions say to add comments that may be relevant to the test.

The results table is Test Before Repairs and Test After Repairs, with Repairs and New Materials between them. Columns are Check Number 1, Check Number 2, and Air Inlet Valve or Relief Valve, plus #1 and #2 Gate or Ball. The instructions say to use a check mark or a number recorded to at least tenths. “Closed Tight” means the valve closed tight. “Leaked” means it leaked. A leak is repaired as soon as possible, and no later than 20 business days after the failed test, then retested until there are no leaks. Repairs go on the Repairs and New Materials row. That repair window is also on Failed backflow test.

The appendix says a differential gauge is required on RP assemblies and pressure vacuum breakers, and optional on double check valve assemblies. The psi bands it prints are Anderson’s Table 2. Those bands are on RPZ testing and Double check versus reduced pressure. They are not reprinted here.

Questions in the policy go to the Cross Connection Control Coordinator at (864) 231-5230.

The state sample, for comparison

SCDES’s sample form is one page. It asks for the owner, a mailing address, “Return Form By,” the test date, a contact person, the assembly address, and the exact location. Device choices printed on it are RP ASSE #1013, RPDA ASSE #1047, DC ASSE #1015, DCDA ASSE #1048, PVB ASSE #1020, and SRVB ASSE #1056, plus make, model, size, and serial number. It has a Line PSI blank.

The initial test has PASS and FAIL lines. The final test has a PASS line. Reduced-pressure and double-check columns record Closed Tight, Leaked, a PSID reading, and whether the relief valve opened or did not open. Pressure-vacuum-breaker and spill-resistant columns record the check valve and the air inlet the same way. The form also asks whether the number 2 shutoff valve closed tight or leaked, and whether water service was restored. The certification line says the device was tested per applicable codes and the required performance standards. The tester block adds Test Type, gauge serial number, and testing firm.

That sample is not the Greenville Water form, the Spartanburg Water form, or Anderson’s Appendix 2. Use the form the letter names.

If the letter is from another utility

Greer CPW’s test report, printed in the April 2025 plan, is summarized on Greer CPW. Seneca Light & Water’s October 2021 manual describes a mailed reminder and says results go through an online portal. It does not include a blank public test form. That summary is on Seneca Light & Water. Easley Combined Utilities’ blank test form, and the lines it does not include, are on Easley Combined Utilities. Blue Ridge Rural Water’s section 14 says device owners are notified of testing by mail. The pages and PDFs read for Blue Ridge Rural Water did not include a blank test form or a day count. Laurens County Water and Sewer Commission notifies a customer who has a testable device 60 days before that customer’s testing deadline, and it mails a certified letter if the deadline is missed. That page does not include a blank test form. Laurens CPW publishes a blank test form and does not print a due date on it. Both are on Laurens. Gaffney Board of Public Works’ test form says to email the finished report to the address on the form. It does not print a due date. That form is on Gaffney Board of Public Works. Inman-Campobello’s test form, linked from the backflow program page, does not print a due date or an email address for the finished report. The header prints a fax number and does not label it as the place to send the test. That form is on Inman-Campobello. SJWD’s test form prints a blank labeled Test Report Due and does not print a calendar date, a fee, or an email for the finished report. That form is on SJWD. Starr-Iva Water and Sewer District’s forms page links a backflow report. The form does not print a due date, a test fee, or an address for the finished report. That form is on Starr-Iva. West Anderson Water District’s related-documents block links a backflow device test report. The form does not print a due date, a test fee, or a line that says where to send the finished report. The category line prints Inspector Test. That form is on West Anderson. The City of Pickens publishes two test forms. Neither prints a due date or a test fee. The public-works page says to send results to the post office box on that page. The August form prints an email on the contact line and does not say to email the finished report there. That summary is on City of Pickens. Notice forms for other Pickens utilities, other Oconee utilities, and the other Upstate systems were not in the documents read for this page. Use the letter on the account. General Testers with an address in a county are listed for Greenville, Spartanburg, Anderson, Pickens, Oconee, Laurens, and Cherokee. Confirm the current SCDES card before you hire.

Official links are on Resources.

Greenville Water notice Find a Greenville County tester

Sources read for this page on October 14, 2026: Greenville Water’s backflow prevention page, the manual at CCC-Manual-20251110.pdf (file properties dated November 10, 2025), and the blank field-test form linked from that page; Spartanburg Water’s cross-connection page, the manual revised June 4, 2026, and the field test and maintenance report linked from that page; Anderson Electric City’s September 2008 cross-connection policy, including Appendix 2; SCDES’s sample test form; R.61-58.7(F) on des.sc.gov. The Laurens sentences were checked November 1, 2026 against the Laurens County Water and Sewer Commission backflow page and Laurens CPW’s water page and test form. The Gaffney sentence was checked November 2, 2026 against the Backflow Device Test Report Form linked from the Gaffney BPW menu. The Inman-Campobello sentence was checked November 3, 2026 against the test form linked from the district’s backflow program page. The SJWD sentence was checked November 5, 2026 against the backflow test form linked from the engineering page and the business page. The City of Pickens sentence was checked November 11, 2026 against the public-works page and both test forms linked from the city site. The Starr-Iva sentence was checked November 20, 2026 against the backflow report linked from the forms page. The West Anderson sentence was checked November 21, 2026 against the Backflow Device Test Report Form linked from the district’s forms page.