Upstate South Carolina

Upstate Backflow

Annual backflow testing directory. Not a water utility.

Failed backflow test: what happens next

A failed test is a report, then a repair or a replacement, then another test. The state rule says the assembly is tested again immediately after any repair. The days after that come from the utility’s manual.

Sources checked October 13, 2026.

If this page and the letter on your account disagree, follow the letter and the manual it cites. What is backflow testing is the annual-test rule. This page is what the three published Upstate manuals say happens when the result does not pass. Who arranges the repair, and when a routine repair is not a full replacement, is on Backflow preventer repair. This site does not publish a repair price.

What the report calls a failure

R.61-58.7(F)(7) covers a double check valve assembly, a pressure vacuum breaker, or a reduced pressure principle assembly installed to protect the public system. Section (7)(a) says a certified tester tests the assembly after installation and before the customer uses it, and at least once a year, except where paragraph (3)(a)(ii) sets a different schedule for low-hazard residential irrigation. Section (7)(b) says the public water system receives a written report, submitted by the certified tester who made the test. Section (7)(c) says every backflow prevention assembly is tested immediately after repairs of any kind.

SCDES’s sample test form prints an initial test with a pass line and a fail line, a repairs block, and a final test with a pass line. The form says many jurisdictions require their own form.

The forms the three utilities publish record the result in their own boxes:

  • Greenville Water’s blank field test form has an initial test and a test after repairs. The form prints “Forms Must be Returned to Greenville Water System within 7 Days of Test.”
  • Spartanburg Water’s field test and maintenance report has a test before repair and a test after repair.
  • Anderson’s September 2008 policy includes a sample form. The instructions say that if a valve leaked, the device is repaired as soon as possible, and no later than 20 business days after the failed test, then retested until there are no leaks. Repairs go on the row labeled “Repairs and New Materials.”

How to read each labeled line on those forms is on How to read your notice.

Anderson’s Table 2 is that utility’s minimum for a passing test. The psi bands are on RPZ testing and Double check versus reduced pressure. Greenville Water’s manual and Spartanburg Water’s manual, in the sections read on October 13, 2026, do not print those bands. R.61-58.7(F) does not print them either. On those two systems, the pass or fail is the result the certified tester enters on the form the utility accepts.

A test report is not itself the repair. Installing or replacing an assembly for hire can be a separate licensing question. That split is on General vs Limited.

Greenville Water

The failure paragraph is section 7-2 of the Cross Connection Control Manual PDF dated November 10, 2025. The notice schedule and the fee are in sections 7-4, 7-5, and 4-3. The notice walk-through is on Greenville Water.

Section 7-2 says that if the assembly fails the required test and cannot be repaired immediately — the manual’s example is repair parts on order — the tester returns a copy of the test report explaining the failure to Greenville Water the same day. After the assembly is repaired, it is tested immediately, and the completed report is returned to Greenville Water the same day.

That paragraph is the failure that cannot be finished on the spot. The blank form quoted above prints a 7-day return line. If the form and section 7-2 read as different clocks, follow the letter and the manual.

A passing report sits on the notice schedule. Section 7-5 says Greenville Water has a 15-day grace period after the test due date for a passing device test, or a replacement device and a passing test, to reach the program. Section 7-4 says customers who have not returned a completed test report within the 60-day period are in noncompliance, and that administrative actions can include discontinuance of water service. Section 7-5 says a third notice is mailed 15 days after the due date, Greenville Water will test the backflow, and a $500 non-compliance fee will be charged to the account. Section 4-3 calls that a one-time $500 non-compliance late fee at 15 days late. If the device is non-compliant, section 4-3 says Greenville Water will hire a third-party vendor to complete the test, and that the cost of the necessary repairs will be applied to the account. The same section says Greenville Water is not liable for damages, losses, or claims arising from discontinuation of water service.

The manual does not print a price for a repair the customer arranges. The $500 figure is the non-compliance late fee in section 4-3.

Certified testers upload results in the portal described on the Greenville Water page. Questions in the manual go to the Cross Connection Control Department at (864) 241-6100.

Spartanburg Water

Section 10.3 of the Cross Connection Control Manual revised June 4, 2026 is titled Test Failures. The notice tiers for a test that was never filed are on Spartanburg Water.

If the assembly fails and cannot be repaired immediately, the tester returns a copy of the failed test report to Spartanburg Water the same day, with an explanation of the failure and the repairs needed. Failing assemblies must be satisfactorily repaired or replaced, completely retested, and the reports submitted within 10 business days of the date of the test failure.

If during that time Spartanburg Water determines the potable water supply is at risk of a potential backflow or cross connection as a result of the failed assembly, the manual says the water service shall be disconnected immediately.

An extension has to be requested by the tester or the customer within 3 business days of the test failure. Spartanburg Water then notifies the customer or the tester that an extension is granted and for how long, or that no extension is granted. Granting or denying an extension is at Spartanburg Water’s sole discretion. Section 10.4 says the grant that keeps a late repair out of non-compliance is in writing.

Section 10.4 treats the account as non-compliant when a failing assembly is not satisfactorily repaired or replaced, retested, and covered by a test report indicating compliance within 10 business days of the original failure, unless that written extension exists. The same section says that failure may result in Spartanburg Water testing an assembly located at the property line or meter, or otherwise readily accessible. The customer assumes Spartanburg Water’s costs for testing, repairing, retesting, or replacement, plus a $50 administrative fee, added to the water bill. If access to the assembly is not available, Spartanburg Water may suspend water service.

Section 11 uses different day counts. Section 11.2(c) says failing assemblies must be repaired or replaced within ten days after notification by Spartanburg Water, or an extension of time. Section 11.3 says service may be discontinued if a required assembly is not installed, tested, and maintained, if a device has been removed or bypassed, or if an unprotected cross connection exists with inadequate protection at the service connection. It also says a written notice will state that water service will be terminated within ten days if the requirements are not met, and that the customer is responsible for all applicable reconnection fees. The manual does not print a dollar amount for those reconnection fees. It says Spartanburg Water will not be liable for damages, losses, or claims arising from discontinuance of water service.

The $50 figure is the administrative fee in section 10.4 when Spartanburg Water does that work. The manual does not print a price for a repair the customer arranges. The contact on the utility’s cross-connection page is Matthew Jamison, Field Operations Manager, at (864) 598-7213 or ccc@spartanburgwater.org.

Anderson Electric City Utilities

The Cross Connection Control Policy, September 2008 revision, says the policy can change and that the customer is responsible for the current copy. The sentences below are from the current-customer section and the appendix. The routine filing days are also on Anderson, Pickens, and Oconee.

A device that does not meet the criteria for a properly functioning device is repaired or replaced and retested. Defective devices are repaired or replaced as soon as possible, and no later than 20 business days after the failed test. The appendix repeats that a leak is repaired and retested until there are no leaks, and that the repairs are written on the form.

The tester submits the form to the Cross Connection Control Coordinator within 10 days after the test, or the customer is subject to having water service disconnected. The same section says forms must arrive no later than 90 days after the customer received the form, or 45 days for in-ground irrigation. Failure to test a device, or to repair or replace a faulty device, after Electric City Utilities has given notice, results in disconnection of water service. The customer is subject to any applicable reconnection fees. The sections read for this page do not print a dollar amount for those fees. After service is restored, the device is tested, including repair or replacement and a retest, within three days, or the water will be disconnected again.

Questions in the policy go to the Cross Connection Control Coordinator at (864) 231-5230.

The current-customer paragraph does not print a separate repair window for a dedicated fire line. How that device is tested is on Fire-line backflow.

A repair price is not on these documents

The three manuals do not print a price for a repair the customer hires. The cost guide keeps a third-party range for the test itself, labeled as that publisher’s range, separate from Greenville Water’s $500 non-compliance fee and Spartanburg Water’s $50 administrative fee. Ask the tester to put any return visit in writing. This page does not add a repair quote.

If your utility is not one of these three

Greer CPW’s same-day report after a failure, and the 37-day non-compliance split, are on Greer CPW. Seneca Light & Water’s seven-day portal entry after a repair is on Seneca Light & Water. Easley Combined Utilities’ water page says its policy requires an annual test of a double check, and it does not print a repair window. That page is Easley Combined Utilities. Laurens County Water and Sewer Commission’s backflow page describes a missed testing deadline: a certified letter, then 15 days from receipt. It does not print a repair window after a result that fails. Laurens CPW’s water page and September 8, 2021 specifications do not print one either. Both are on Laurens. Gaffney Board of Public Works’ test form has a repairs row and a test-after-repairs row. It does not print a number of days. That form is on Gaffney Board of Public Works. Powdersville Water’s September 2024 policy says a failed assembly that cannot be repaired immediately is replaced immediately, then tested, and the report is submitted promptly. The 90-day letter and the 30-day clocks are on Powdersville Water. Inman-Campobello’s backflow page says to contact a professional immediately to repair or replace a device that fails. The test form has a repairs row and a final-test row. It does not print a number of days. That page is Inman-Campobello. SJWD’s test form has a repairs block and a final-test row. It does not print a number of days after a result that fails. That form is on SJWD. The Town of Pendleton’s section 50.035 says a device that fails is repaired or replaced and retested at the owner’s expense, and it sets a compliance date of not more than 30 days after the test date. That date is on Town of Pendleton. It is not Anderson’s 20 business days. Failed-test deadlines for other Pickens utilities, other Oconee utilities, and the other Upstate systems were not on utility pages verified for this edition. Use the letter on the account. General Testers with an address in a county are listed for Greenville, Spartanburg, Anderson, Pickens, Oconee, Laurens, and Cherokee. Confirm the current SCDES card before you hire.

Official links are on Resources.

Greenville Water notice Find a Greenville County tester

Sources read for this page on October 13, 2026: R.61-58.7(F) on des.sc.gov; the SCDES sample test form; Greenville Water’s November 10, 2025 manual and blank test form; Spartanburg Water’s manual revised June 4, 2026, its field test report, and its cross-connection page; Anderson Electric City’s September 2008 cross-connection policy. The Laurens sentences were checked November 1, 2026 against the Laurens County Water and Sewer Commission backflow page and Laurens CPW’s water page and September 8, 2021 specifications. The Gaffney sentence was checked November 2, 2026 against the Backflow Device Test Report Form linked from the Gaffney BPW menu. The Powdersville sentence was checked November 3, 2026 against section 2.3 of the September 2024 cross-connection policy. The Inman-Campobello sentence was checked November 3, 2026 against the backflow program page and the test form linked from that page. The SJWD sentence was checked November 5, 2026 against the backflow test form linked from the engineering page and the business page. The Pendleton sentence was checked November 8, 2026 against section 50.035 of the town code.